Company Profile:
A U.S. Department of the Interior agency that oversees water resource management incuding the oversight and operation of numerous diversion, delivery, and storage projects the agency has built throughout the western United States for irrigation, water supply, and attendant hydroelectric power ...
Contraction joints are joints placed in concrete to provide for volumetric shrinkage of a monolithic unit or movement between monolithic units. Contraction joints have no bond between the concrete surfaces forming the joint. Except as otherwise provided for dowels, reinforcement is never continuous across a contraction joint. Contraction joints will not transfer moment and will not transfer shear unless keyed.
Industry:Engineering
Concrete portion downstream from conduit, tunnel, or control structure. A pool, usually lined with reinforced concrete, located below a spillway, gate, or valve into which the discharge dissipates energy to avoid downstream channel degradation. A basin constructed to dissipate the energy of rapidly flowing water (e.g., from a spillway or outlet) and to protect the riverbed from erosion. See terminal structure.
Industry:Engineering
Qualitative description of how severe a possible flood could be (High, Medium, Low) depending on failure modes (including rate of failure), flood velocity, channel width, magnitude of damage potential, rate of rise for flood waters, etc. High severity would be associated with structures being swept clean from their foundations. Low severity would indicate that a slow, gradual rise of flood waters is anticipated.
Industry:Engineering
Checked signatures verify that all probability estimates, inputs and outputs and their distributions, were entered correctly into event trees, and that any other calculations, figures, or tables have been checked. This includes "back-of-the-envelope" calculations performed during the risk analysis but not documented in any place but the report. In addition, the accuracy of computer spreadsheets have been checked.
Industry:Engineering
This is the signature of the person or persons with primary responsibility for writing the document. Signature of the document by the author(s) signifies that a draft document was provided to team members and that they had an opportunity to comment on the draft. The author's signature also implies that comments were considered and that any critical issues or influencing factors were incorporated into the document.
Industry:Engineering
A pump that moves water by centrifugal force developed by rapid rotation of an impeller. A pump consisting of an impeller fixed on a rotating shaft that is enclosed in a casing, and having an inlet and discharge connection. As the rotating impeller whirls the water around, centrifugal force builds up enough pressure to force the water through the discharge outlet. The rotating impeller imparts energy to the water.
Industry:Engineering
A voluntary organization of transmission owners, transmission users, and other entities interested in coordinating transmission planning, expansion, operation, and use within a region. The Federal Energy Regulatory Commission (FERC) is encouraging the formation of these voluntary associations to resolve technical transmission and pricing issues. Procedures developed by the groups would be subject to FERC approval.
Industry:Engineering
Indicators that may signal the presence of hazardous materials include stressed vegetation or unusual lack of vegetation; dead or sick domestic stock, wildlife, or birds; fish kills or otherwise unexplained stream sterility or diminished species and numbers of flora and fauna; unusual coloration or discoloration of the land surface; and acrid or other chemical odors. However, some of the indicators may be ambiguous.
Industry:Engineering
In addition to earthquakes that occur on mapped faults, hazards are also presented by earthquakes not associated with known geological structures. The occurrence of these events is best viewed as a random process, hence the term "random" earthquake. Based on earthquake recurrence relationships for an area, estimates of source-to-site distances can be calculated for various magnitudes and probabilities of occurrence.
Industry:Engineering
The hard, firm and stable parts of the earth's crust. A sound and solid mass, layer, or ledge of mineral matter inplace, and of such hardness and texture that it cannot be effectively loosened or broken down by a 6-pound drifting pick or by ripping in a single pass. Natural solid mineral matter occurring in large masses or fragments. Naturally formed, consolidated material composed of grains of one or more minerals.